I applied in-person. The process took 1 day. I interviewed at GoodHeart (San Antonio, TX) in Mar 2015
Interview
Ask of Motor wiring single phase and three phase, repair and install start,stop,estop. replace drives power flex low and high voltage, wire transformer low and high voltage ,repair lighting fixture, install, indoor ,outdoor single phase and three phase panel.