Appel téléphonique pour présélection. Entretien technique avec l'équipe pour évaluer les compétences. Test pratique pour vérifier les connaissances et les aptitudes. Résultats et décision finale.
C est tout, bon chance
I applied online. The process took 1 week. I interviewed at Deezer (Paris) in Sept 2022
Interview
HR took a long time between first contact, scheduling interviews and follow-ups. I got through a HR discussion and a technical discussion and test. I had a final discussion with some more technical team members but the interview was cancelled an hour before time and I was told that they hired someone. They should be more efficient with following-up and scheduling interviews.
Interview questions [1]
Question 1
Motivation, Technical software engineering concepts, HR fit interview, SQL and Python test.
I applied online. The process took 2 months. I interviewed at Deezer (Paris) in Mar 2022
Interview
- Prescreening RH - Entretien Manager - Take-home (code + system design) - Présentation du take-home devant deux membres de l'équipe et discussion - Pas de retour du RH Le RH a décalé plusieurs fois le premier appel, parfois sans notice. Take-home project trop long. Une partie "optionnelle" mais il est pénalisant de ne pas la faire, puisque d'autres candidats pourront passer plus de temps. Présentation du take-home à deux développeurs de l'équipe. Réponse à toutes les questions des développeurs, entretien de bonne qualité d'après eux. Très bon feeling. Pas de retour recruteur après coup malgré relance.