I applied in-person. The process took 4 weeks. I interviewed at Corman Construction (Richmond, VA) in Sept 2014
Interview
Put in an application at the shop. I called multiple times, and finally got moved to the top of the list. Got a physical and a urine screen. Then I sat in an 3 hour orientation where everything was gone over and discussed.