I applied through university. The process took 3 weeks. I interviewed at Bose (Bloomfield Township, MI) in Apr 2018
Interview
They flew me out to their facility, and interviewed through a few different groups of engineers. Mostly a technical interview. Each round was about 30 to an hour long, asking me several questions with different depths to each question.
Interview questions [1]
Question 1
IIR and FIR Filter Design. Analog Filter Design. Signals and test